It’s the last day and last article of the year, so we will look at some highlights of 2023, some traffic statistics on the CNX Software website, and speculate what interesting developments may happen in 2024. Looking back at 2023 The semiconductor shortage that had happened since 2020 started to fade away in early 2023, and supplies for most electronics components and devices seem to be adequate at this time, so that was a bright spot this year, and hopefully, it will stay that way in 2024 despite geopolitical tensions. We did not have any super exciting new Arm application processors from Rockchip, Amlogic, or Allwinner announced this year, although the Amlogic S928X penta-core Cortex-A76/A55 CPU started to show up in some 8K TV boxes. The launch of the Raspberry Pi 5 SBC with a Broadcom BCM2712 quad-core Cortex-A76 processor was probably the main highlight for Arm on this side […]
GEEKOM unveils its presence at CES 2024 (Sponsored)
GEEKOM, renowned as the Green Mini PC Global Leader, proudly announces its participation in the long-awaited CES 2024, solidifying its standing as the global leader in Mini PCs. With two decades of industry expertise, GEEKOM has consistently delivered high-quality, environmentally friendly Mini PCs, establishing itself as the go-to brand for reliable computing solutions. As CES 2024 approaches, GEEKOM is gearing up to showcase its latest innovations. Besides exhibiting its already diversified lineup of mini PCs, GEEKOM has also promised to release a few new exciting products at CES 2024. First up is the IT14 Pro. The 0.7L mini PC will feature up to an Intel Meteor Lake Core Ultra 7-155H processor, with dual-channel DDR5-5600 RAM and dual SSDs. Built on the all new 4nm process, the Ultra 7 chip is 20% faster compared to last generation’s Intel Core i7-1360P in terms of CPU multi-core performance, delivering ample oomph for even […]
ASRock Industrial NUC Ultra 100 Meteor Lake-H motherboards feature Core Ultra 5 125H and Core Ultra 7 155H processors
ASRock Industrial has just announced two NUC Ultra 100 motherboards powered by Intel Core Ultra Meteor Lake-H processors namely the Core Ultra 5 125H and Ultra 7 155H with up to 16 cores and 22 threads, and integrating Intel ARC Graphics and the new Intel NPU AI engine. As the name implies, the NUC Ultra 100 Motherboard Series are designed in NUC form factor, support up to 96GB dual-channel DDR5-5600 MHz memory, three storage interface, up to four 4K displays, and offer two 2.5GbE networking ports, one USB4/Thunderbolt, and four USB 3.2 Gen 2 ports. ASRock Industrial says those features make the motherboards suitable for smart retail, kiosks, digital signage, smart cities, embedded industries, Edge AIoT applications, etc… NUC Ultra 100 motherboards specifications: Meteor Lake-H SoC (one or the other) Intel Core Ultra 7 T4 155H 16-core (6P+8E+2LPE) processor @ 1.4 / 4.8 GHz with 24MB cache, Intel 8Xe LPG […]
COM Express Type 6 Compact module features 14th gen Intel Core Ultra “Meteor Lake” processor
ADLINK cExpress-MTL is a COM Express Type 6 Compact module based on the just-announced 14th gen Intel Core Ultra “Meteor Lake” processor family with up to fourteen CPU cores in 6P+8E configuration, eight Xe-cores (128 EUs), and an NPU (11pTOPS/8.2eTOPS) in a 15 or 28W TDP thermal configuration delivering up to 1.9x the GPU performance of the previous generation (Raptor Lake). The power consumption will also be lower thanks to Intel Core Ultra’s new Low-Power E-cores that are 30 to 50% more efficient than the E-cores in 13th gen Intel Core processors, and the faster GPU and built-in NPU will enable hardware-accelerated AV1 encoding/decoding and various devices leveraging AI such as portable medical ultrasound devices, industrial automation, autonomous driving, AI robots, and more. cExpress-MTL specifications: Meteor Lake-H/U SoC (one of the other) Intel Core Ultra 7 MS3 165H 16-core (6P+8E+2LPE) processor @ 1.4 / 5.0 GHz with 24MB cache, Intel […]
Intel Lunar Lake hybrid mobile processors to integrate on-chip LPDDR5X memory (MoP)
While Intel Meteor Lake mobile processors are yet to become available, we already have a leak that provides quite a lot of details about the next-generation Lunar Lake hybrid mobile processor family (LNL MX) with supports for 8W to 30W base power designs and 16GB or 32GB on-chip LPDDR5x memory (Memory-on-Package, or MoP) to deliver higher memory bandwidth at reduced footprint and power. Developed in collaboration with Microsoft, the new Lunar Lake processor will come with four P-cores and four low-power E-cores, a new generation NPU and GPU architecture for AI workloads, and improved power management for lower power consumption (40% scenario power reduction) and improved battery life. Four SKUs are currently planned with either 16GB or 32GB dual-channel LPDDR5X memory: Core 7 MS3 (+ MoP) – Octa-core “12M” processor with 4x P-cores, 4x E-Cores, 8-core Xe2-LPG GPU, and 6-tile (12K9M) NPU Core 5 MS1 (+MoP) – Octa-core “8M” processor […]
Intel Meteor Lake mobile processor highlights leaked
Intel Meteor Lake processor family is supposed to succeed the 13th generation Raptor Lake chips itself coming after the current 12th generation Alder lake processors. It is scheduled to launch next year (2023), but we already have some details about the Meteor Lake U, P, and H mobile processors from a leak. Just like most Alder Lake processors, Meteor Lake will be hybrid processors with power and energy-efficient cores, but they’ll also feature new LP E-cores which should stand for “low power efficiency” cores in order to further lower the power consumption while a laptop or mini PC in standby mode. Meteor Lake mobile processors highlights: CPU P cores + E cores + LP-E cores architecture U-series with up to 12 cores P- and H-series up to 14 cores; Up to 6+8 configuration with up to 24MB LLC/core (Note the LP-E cores don’t seem to be part of the main […]
Intel aims to be the performance per watt leader by 2024 with Lunar Lake processors
Apple-designed Arm processors have shown it’s possible to get high-performance at relatively low power, and this has left competitors behind in that regard. But Intel aims to rectify that with the goal of becoming the “performance per watt leader” by 2024 with the new Lunar Lake processors manufactured with Intel 18A process. Intel also provided some details about families following Alder Lake processors with Raptor Lake expected later this year, Meteor Lake and Arrow Lake based on Intel 4 and 20A processes in 2023-2024 2022, and Lunar Lake expected in 2024+. Let’s have a look at what we know so far for each family. Intel Raptor Lake The Raptor Lake processors will rely on the same “Intel 7” process as Alder Lake processors, offer up to double-digit performance boost (translation: up to around 10% in specific workloads), up to 24 cores and 32-threads, better overclocking, support for AI M.2 modules […]